1. Technical Parameters & Specifications
| Technical Property | Standard Specifications & Custom Options |
| Model Number | 01 |
| Standard Sizes | Door Leaf Height of Composite Pocket Doors: 80″ (6/8) / 84″ (7/0) / 96″ (8/0), with 80″ as the minimum passage height.
Door Leaf Width of Composite Pocket Doors: Standard series 60″ / 72″ / 96″ ; narrow options 15″ (1′-3″) and 18″ (1′-6″) available, typically for bi-fold doors. Door Leaf Thickness: 1-3/8″ (standard specification for typical interior applications); 1-3/4″ (recommended if door exceeds 36″ wide or is over 90″ high). Accessibility Clearance: 36″ minimum width to allow persons with disabilities to pass through cleanly. Width & Common Application
|
| Surface Finishing | Melamine/PVC/PU Finish |
| Internal Structure |
Solid Wood Log: 100% natural timber core. Solid Core: Fir/Pine skeleton + Tubular Particleboard/MDF core. Semi-Solid: Honeycomb paper core option. |
| Material Composition | Red Oak, Walnut, Cherry, Sapele, Teak, Mahogany, or High-Density MDF boards. |
| Hardware Components |
Standard Lockset: Anti-theft mechanical lock / Smart electronic lock. Hinges: 3x Heavy-duty Stainless Steel 304 butterfly/ball-bearing hinges. Accessories: Hydraulic door closer, magnetic door stopper, automatic drop seal. |
| Packaging Details | Inner plastic film protective layer + EPE foam corner protection + Strong 5-layer corrugated export carton (Palletized shipping are used upon container loading). |
2. Global Trade & Logistical Terms
-
Incoterms Available: FOB, CIF, EXW, DAP, DDP.
-
Payment Terms:
-
30% T/T advance deposit upon order confirmation, 70% T/T balance payment against the copy of Bill of Lading (B/L)
-
Irrevocable L/C at sight.
-
-
Shipping & Logistics:
-
Port of Loading: Shenzhen / Shanghai Port.
-
Shipping Methods: Ocean Freight (FCL – Full Container Load / LCL – Less than Container Load), Intermodal Rail, or Road Transport.
-
Container Capacity: 80-200 sets / 20GP container; 400-500 sets / 40HQ container (varies by door leaf size and frame packaging).
-
Production Lead Time: 25–35 days after deposit confirmation and technical drawing approval.
-














