1. Technical Parameters & Specifications
|
|
1. Composite Pivot Door — 05Our dark red front door uses a composite core primed and painted for a bold entry that swings true and makes a strong first impression. These details can be tailored to order.
|
|
|
2. Composite Swing Door — 01Our dark red front door uses a composite core primed and swing on fitted hinges to close true. All options are available through made to measure service.
|
|
|
3. Solid Full Wooden Door — MY-8053Our dark red front door is primed and painted over a genuine timber core that can be repainted later for a face built to last for years of daily use. These can be achieved through custom orders.
|
|
|
4. Solid American Door — MY-9011Our dark red front door is primed and spray painted over a solid core for a classic face. Every detail can be made to order for your project.
|
|
|
5. Solid Modern Door — JY-24-66Our dark red front door uses flat lines with a smooth painted finish over a solid core for a calm yet characterful feel.These can be customized to order.
|
|
|
6. Solid European Door — MY-8017/MY-8018Our dark red front door uses fine molded panels primed and painted over a solid core for calm depth and an elegant face. These looks can all be realized through customization.
|
|
|
7. Solid Half Glass Door — MY-9018Our dark red front door pairs a glass panel with a smooth painted face over a solid core for light and calm that feels both open and private. Every detail can be made to order for your project.
|
2. Global Trade & Logistical Terms
-
Incoterms Available: FOB, CIF, EXW, DAP, DDP.
-
Payment Terms:
-
30% T/T advance deposit upon order confirmation, 70% T/T balance payment against the copy of Bill of Lading (B/L)
-
Irrevocable L/C at sight.
-
-
Shipping & Logistics:
-
Port of Loading: Shenzhen / Shanghai Port.
-
Shipping Methods: Ocean Freight (FCL – Full Container Load / LCL – Less than Container Load), Intermodal Rail, or Road Transport.
-
Container Capacity: 80-200 sets / 20GP container; 400-500 sets / 40HQ container (varies by door leaf size and frame packaging).
-
Production Lead Time: 25–35 days after deposit confirmation and technical drawing approval.
-






















